■ STAFF REPORT – The installation of the Boca Grande swing bridge’s new scale lane is almost complete, and it is scheduled to reopen on Monday, Aug. 28 at 5:45 a.m. The Gasparilla Island Bridge Authority originally installed the truck scale in 2000. Removal of the old scale began on Monday, July 31. GIBA Executive Director […]