The temporary bridge over the Boca Grande Bayou being used by the Gasparilla Island Water Association to remove old equipment will be gone by Thanksgiving. GIWA Executive Director Ron Bolton said that the window for removal from the contractor could be Oct. 17 to 26, according to the contractor. Currently, the bridge is not only […]