According to members of the Boca Grande Cell Phone Tower Committee, everything appears to be on track for complete carrier installation on the new tower by Thanksgiving.
“We had a call yesterday with Verizon and today with Vertical Bridge,” said Committee Member Steve Raville. “Everyone maintains that the schedule is still on track to have AT&T, Verizon and T-Mobile installed on the tower by Thanksgiving. As is usually the case, there may be some minor delays but, so far, we seem to be on track. “