Skip to main content

Bayou temporary bridge gone by Thanksgiving after GIWA work  

October 2, 2025
By Staff Report
The temporary bridge over the Boca Grande Bayou being used by the Gasparilla Island Water Association to remove old equipment will be gone by Thanksgiving. GIWA Executive Director Ron Bolton said that the window for removal from the contractor could be Oct. 17 to 26, according to the contractor. Currently, the bridge is not only […]

Already a website subscriber? Login below.

Become a Website Subscriber    Read E-Edition